Fee Schedule

FY 2025–2026 FEE SCHEDULE
Effective July 1, 2025 – June 30, 2026

Residential:

  • Singlewide Set-Up: $100.00
  • Electrical: $100.00
  • Plumbing: $100.00
  • Doublewide/Triplewide Set-Up: $100.00
  • Electrical (Doublewide/Triplewide): $100.00
  • Plumbing (Doublewide/Triplewide): $105.00
  • Single Family: $0.47
  • Duplex/Apartment (New): $0.65
  • Townhouse: $0.47
  • Modular: $0.47
  • Accessory Building: $0.38
  • All Unheated: $0.32
  • Solar Residential: $100.00
  • Finish Bonus Room (Modular): $150.00
  • Deck/Porch (Open): $100.00
  • Porch/Deck (Covered): $150.00
  • Garage Enclosure: $150.00
  • Remodel to 1000 sq ft: $150.00
  • Remodel over 1000 sq ft: $250.00
  • Remodel Apartments: $200.00 per unit
  • Moved Home Footing and Foundation: $150.00
  • Moved Home Renovations: $225.00
  • Swimming Pool: $150.00
  • Piers: $150.00

Commercial:

  • Heated: $0.60
  • Unheated: $0.40
  • Commercial Roof Replacement: $75.00
  • Remodel Up to 1000 sq ft: $200.00
  • Remodel Over 1000 sq ft: $400.00
  • Cell Phone Tower: $500.00
  • Existing Tower: $200.00
  • Change of Use: $100.00
  • Commercial Solar Projects (per $1M): $1,000.00
  • Plan Review: $100.00

Plumbing:

  • New Construction (up to 10 fixtures): $150.00
  • Each Additional Fixture: $5.00
  • New Commercial Construction: ¼ of 1% of total project cost
  • Addition/Remodel (up to 5 fixtures): $100.00
  • Commercial Addition/Remodel (up to 5 fixtures): $150.00
  • County Water: $40.00
  • Modular: $105.00
  • Yard Sprinkler System (up to 15 heads): $100.00
  • RV Sites Campground Plumbing: $100.00 + $10.00 per site
  • Water Heater (over 120 gallons): $75.00
  • Fire Sprinkler Service & Stand Pipe: $100.00
  • Sewer Line Replacement: $30.00
  • Lift Pumps for Sewer: $40.00

Mechanical:

  • Installation per Ton Unit: $40.00 (first ton), $30.00 (each additional ton)
  • Heating System:
    • Up to 100,000 BTU: $75.00
    • 100,001–250,000 BTU: $100.00
    • 250,001–450,000 BTU: $125.00
    • 450,001–650,000 BTU: $150.00
    • 650,001–850,000 BTU: $200.00
    • 850,001–1,500,000 BTU: $225.00
  • Commercial Kitchen Hoods (each): $100.00
  • Gas Piping (one unit): $75.00
  • Add Gas Unit: $5.00
  • Commercial Exhaust & Intake Fans (each): $90.00

Miscellaneous:

  • ABC Inspection: $150.00
  • Therapeutic Home (New): $150.00
  • Therapeutic Home (Annual): $100.00
  • Day Care (New): $150.00
  • Group Home: $150.00
  • Day Care (Annual): $100.00

Sign Permits:

  • Sign up to 32 sq ft: $150.00
  • Each Additional sq ft: $0.50
  • Small Business (up to 16 sq ft): $75.00
  • Each Additional sq ft (Small Business): $0.50
  • Subdivision (up to 16 sq ft): $75.00
  • Each Additional sq ft (Subdivision): $0.50
  • Billboard Only: $0.30

Insulation:

  • Up to 1000 sq ft: $75.00
  • Above 1000 sq ft: $0.03 per sq ft

Moving House:

  • In County Inspection: $50.00
  • Outside of County: $150.00
  • Footing and Foundation: $150.00
  • Footing for Mobile Home: $75.00

Electrical:

  • Modular (Residential & Commercial): $100.00
  • New SFR (up to 2000 sq ft): $170.00
  • SFR 3000 sq ft: $220.00
  • 3001–4000 sq ft: $270.00
  • Above 4000 sq ft: $345.00
  • Above 200 AMP: $0.40
  • T-Pole (180 day): $75.00
  • Service Pole (Permanent): $150.00
  • Temporary Power Certificate (Res.): $125.00
  • Temporary Power Certificate (Comm.): $150.00
  • Commercial Pole Lights: $120.00
  • A/C Wiring: $40.00
  • Hood Wiring: $50.00
  • Lift Pumps for Sewer: $60.00
  • Fire Alarm System: $100.00
  • Hood Suppression System: $100.00
  • Service Change up to 200 AMP: $150.00
  • Above 200 AMP: $0.25
  • Service Repair Only: $100.00
  • Reconnection: $75.00
  • Sub Panel & Step Down Transformer: $75.00
  • Per Inverter: $10.00
  • Per String: $5.00
  • Generator: $125.00
  • Automatic Transfer: $25.00
  • Cell Phone Tower: $175.00
  • Pool Bonding: $150.00
  • Sign: $75.00
  • Pier: $150.00
  • Billboard Electrical: $125.00
  • Bulkhead/Seawall/Retaining Wall: $100.00
  • Commercial Electrical: ¼ of 1% of total project cost
  • RV Sites Campground Electric: $100.00 + $10.00 per site
  • Up to 20–120 Volt Outlets: $60.00
  • Above 20–120 Volt Outlets: $0.50
  • 240 Volts: $5.00
  • Up to 20–277 Volts: $100.00
  • Above 20–277 Volts: $3.00
  • Up to 15–480 Volts: $125.00
  • Above 15–480 Volts: $5.00

Other Fees:

  • Re-inspection Fee: $75.00
  • Each Additional Re-inspection: $50.00
  • Technology Fee: $10.00
  • Occupying Structures Without CO (first 5 days): $50.00/day
  • Occupying Structures Without CO (after 5 days): $150.00/day
  • Administration Fee (Refunds): $15.00
  • Change of Contractor: $25.00
  • After Hours Inspections: $75.00
  • Returned Check Fee: $35.00
  • Record Search: $20.00